Skip To Main Content
main content

Resident News


Jun 30/15

ALL RESIDENTS

Please be advised that under no circumstances is drilling into the new/old concrete balconies acceptable nor does painting the balcony area in any way or hanging or... Read Post >>
Jun 17/15

All Residents of 35 Spencer Avenue

Please be advised a water shutdown will take place on; Monday June 22th between the hours of 10am and 5 pm Please ensure your taps are left in the off position to avoid any... Read Post >>
Jun 10/15

All Residents of 50 Cordova Avenue.

Dear Resident(s): Please be advised that we are commencing our improvements to our hot water system and will be doing this in three (3) phases. The first phase will commence... Read Post >>
Jun 10/15

All Residents of 981 Main Street West

Please be advised that due to plumbing upgrades there will be a full water shutdown on; June 10th 2015 between the hours of 9 am to 5 pm Please ensure to leave your taps in the... Read Post >>
Jun 1/15

1001 Main Street West Residents

Please be advised that the bike rack currently located at the South end of the building is being re-located to the rear of the building near the rear door on; June 5th... Read Post >>
Jun 1/15

Residents of 981 Main Street West

Please be advised that the bike rack currently located at the rear of the building is being re-located to the rear of the building near the rear door next to the Contractor... Read Post >>
Jun 1/15

24 Mabelle- Roof Replacement

Please be advised that we will be commencing our Roof Replacement Program on or after August 1st 2015. We will be forwarding a complete schedule of the above upon receipt of... Read Post >>